Condo building at 5265 Avenue De Courtrai, Montréal (Côte-des-Neiges/Notre-Dame-deGrâce) Québec, H3W
5265 Avenue De Courtrai
Montréal (Côte-des-Neiges/Notre-Dame-deGrâce) Québec, H3W
5265 Avenue De Courtrai
Montréal (Côte-des-Neiges/Notre-Dame-deGrâce) Québec, H3W
Westbury - Phase 2
1 units
11 floors
Built 2019
Unités disponibles (1)
Trier
5265 Avenue De Courtrai
Westbury - Phase 2 · 1 units found1004
10th floor• 3 ch.
🚗
2808 ft²1011
10th floor• 3 ch.
🚗
1288 ft²1014
10th floor• 2 ch.
🚗
1075 ft²1005
10th floor• 2 ch.
🚗
1005 ft²1009
10th floor• 2 ch.
🚗
999 ft²1007
10th floor• 2 ch.
🚗
967 ft²1015
10th floor• 2 ch.
🚗
725 ft²1010
10th floor• 2 ch.
680 ft²
1002
10th floor• 1 ch.
651 ft²
1101
11th floor• 1 ch.
644 ft²
1001
10th floor• 1 ch.
643 ft²
1008
10th floor• 1 ch.
597 ft²
Page 1 of 1
Condos at 5265 Avenue De Courtrai, Montréal (Côte-des-Neiges/Notre-Dame-deGrâce) Québec, H3W
Informations générales sur l’immeuble
This page summarizes public information about the condo building at 5265 Avenue de COURTRAI, Montréal (features and common amenities) and provides a directory of associated condo units. Data is indicative and may vary.
Explore condo units at Westbury - Phase 2, 5265 Avenue De Courtrai, Montréal (Côte-des-Neiges/Notre-Dame-deGrâce) Québec, H3W. This building includes 1 units across 11 floors. Amenities include elevator, gym, rooftop terrace. Located in Côte-des-Neiges / Notre-Dame-deGrâce borough. Browse unit numbers and approximate floor information, and compare unit sizes in square feet. Data shown is based on public records and aggregated sources; amenities may vary.
Frequently Asked Questions
- Does this building have an elevator?
- Yes, this building has an elevator based on our data.
- What common amenities are available?
- Based on our data, Westbury - Phase 2 has: gym. Other amenities may be available.
- How do unit sizes compare?
- Unit sizes vary; see the list below for approximate square footage of each unit to understand the building's unit mix.
- When was this building built?
- This building was built in 2019.